Get Your Correction Response Package

Upload your letter. Get a complete, code-cited resubmittal package back in 48 hours.

48-Hour Turnaround
Licensed Contractor
Code-Cited Responses
100% Satisfaction Guaranteed

What You're Getting

A correction response package is everything the county needs to say yes on your next submittal. You send us the correction letter and your plan set. We handle the rest — every comment answered, every citation checked, every document formatted the way your jurisdiction wants it.

Every package includes:

  • An itemized response to every comment — with code citations
  • A plain-English triage report so you know exactly where your project stands
  • Architect / engineer coordination memos with clear instructions for stamped items
  • A complete resubmittal package formatted for your jurisdiction

Who it's for

Contractors, owner-builders, architects, and developers who are stuck in plan check and don't have weeks to wait on hourly billers. If you have a correction letter in hand, this is for you.

We are not the Engineer or Architect of Record and do not seal documents — items requiring a stamp are routed to your design professional with clear instructions.

This service can be used for:

  • Building permit corrections
  • Planning / zoning corrections
  • Fire department corrections
  • Resubmittal packages
  • RC1 / RC2 / RC3 correction rounds

Build Your Package

1. Choose Your Plan
2. Add Services (optional)
Pre-Construction
Permit Phase Support
Bidding
Construction Support
3. Your Information
4. Upload Documents
Choose file or drag & drop
Choose file(s) or drag & drop

PDF preferred. You can also upload documents after checkout on the confirmation page.

Secure checkout powered by Stripe

Orders placed after hours or on weekends are confirmed the next business day; your 48-hour turnaround begins at confirmation.

Our No-Risk Guarantee

If your package isn't delivered on time, or a response we authored gets kicked back for a citation error, we fix it free — or refund the package price. Every penny.

You're risking nothing. Your permit is already stuck — we're how it gets unstuck.

Before You Order

Is 48 hours real?

Yes. The clock starts when we have your correction letter, plan set, and payment. Most packages deliver inside 48 hours — if your project is unusually complex, we tell you before we take your money, not after.

What if I pick the wrong project type?

No problem. We review every order before work starts. If your project fits a different tier, we confirm the correct price with you first — nothing changes without your OK.

What if the county rejects a response?

If a response we authored gets rejected for a citation error, we rework it free. That's the guarantee. If the rejection is on a stamped item, we route it to your design professional with exact instructions.

Do you stamp or seal drawings?

No. We are not the Engineer or Architect of Record. Anything that needs a stamp goes to your design professional with a clear, scoped memo of exactly what's required — so their hours stay on engineering, not paperwork.

See How It Works

From correction letter to approved — the process, in one minute.